SGE's involvement in CONVENTIONAL ground anchoring works has been taken a revolutionary turn during the recent years.
Having appreciated all the possible problems associated with conventional ground anchors, SGE has researched, experimented and come out with a new system of installing ground anchors
- SGE Jacked Anchors
Jacked Anchors are installed by hydraulic jacking means in which the capacities of the anchors are immediately known at the time of installation.
The many advantages Jacked Anchors have over conventional ground anchors are :
Since its introduction into the market in 1994, SGE has successfully and speedily constructed more than 5,000 numbers of jacked anchors to sheet pile retaining walls with excavation as deep as 11m, most of them being constructed right in the center of Kuala Lumpur City!

Depth of Excavation: 10m
Main Contractor: PATI

Depth of Excavation: 7m
Main Contractor: SUNWAY CONSTRUCTION

Depth of Excavation: 10m
Main Contractor: PATI

During Construction of Shah Alam Expressway
Main Contractor: BRIDGECON

Deepest Excavation Depth: 9.5m
Main Contractors: Many (ROAD BUILDER, UEM, IJM, PATI etc)

Excavation Depth: 10 - 11m
Main Contractor: ROAD BUILDER

Wall Height: 10 - 12m
Main Contractor: GAMUDA

Excavation Depth: 15 - 17m
Main Contractor: PATI

Excavation Depth: 7m
Main Contractor: ROAD BUILDER

Main Contractor: ROAD BUILDER