Jacked Anchor

SGE's involvement in CONVENTIONAL ground anchoring works has been taken a revolutionary turn during the recent years.


Having appreciated all the possible problems associated with conventional ground anchors, SGE has researched, experimented and come out with a new system of installing ground anchors 

- SGE Jacked Anchors


Jacked Anchors are installed by hydraulic jacking means in which the capacities of the anchors are immediately known at the time of installation.

Advantages

The many advantages Jacked Anchors have over conventional ground anchors are : 


  • Improvement to soil properties  - The soil is densified around the jacked anchor thereby increasing the frictional grip.


  • No problem with collapsible soil especially with sandy and high water table conditions.


  • Assured capacities - All jacked anchors are installed to sufficient capacities at the time of installation. No waiting time needed for curing and hardening of cement grout.


  • Cheaper cost of construction - Failed anchors need to be abandoned or replaced. Cost of conventional ground anchors therefore have to take into consideration risk-related costs.


  • Much faster speed of construction


  • Much cleaner and tidier working conditions.

Track Record

Since its introduction into the market in 1994, SGE has successfully and speedily constructed more than 5,000 numbers of jacked anchors to sheet pile retaining walls with excavation as deep as 11m, most of them being constructed right in the center of Kuala Lumpur City!


  • Jalan Gombak and Jalan Pahang.
  • Jalan Sultan Ismail (SGE Jacked Anchor replaced Conventional Anchors when the latter caused repeated settlement).
  • Kuala Lumpur - Seremban Highway.
  • Jalan Imbi.
  • Old Klang Road (Near Bandar Sunway) - (Conventional ground anchors caused many sinkholes).
  • Existing Rawang - Ipoh Railway Track (70 - 80 locations).
  • LDP near Kelana Jaya.
  • K.L - Seremban Highway and Sg Besi Road (SMART).
  • Jalan Tun Razak (SMART) - (Conventional anchors replaced by SGE Jacked Anchors).

Jacked Anchor Projects

Jalan Pahang - Gombak Interchange (2500 Nos) - 1994

Jalan Pahang - Gombak Interchange (2500 Nos) - 1994

Jalan Pahang - Gombak Interchange (2500 Nos) - 1994

  Depth of Excavation: 10m 

Main Contractor: PATI

SUNWAY Pyramid (1200 Nos) - 1995

Jalan Pahang - Gombak Interchange (2500 Nos) - 1994

Jalan Pahang - Gombak Interchange (2500 Nos) - 1994

  Depth of Excavation: 7m

Main Contractor: SUNWAY CONSTRUCTION

Light Rail Transit System 2 - Ampang K.L (1400 Nos)

Jalan Pahang - Gombak Interchange (2500 Nos) - 1994

Light Rail Transit System 2 - Ampang K.L (1400 Nos)

  Depth of Excavation: 10m 

Main Contractor: PATI

Retaining Wall For K.L - Seremban Highway

Jalan Pahang - Gombak Interchange (2500 Nos) - 1994

Light Rail Transit System 2 - Ampang K.L (1400 Nos)

  During Construction of Shah Alam Expressway

Main Contractor: BRIDGECON

Rawang - Ipoh Electrified Double Track - 80 Locations (4500 nos)

SMART Tunnel at Jalan Sg.Besi - K.L Seremban Highway (Old Airport Road) (3500 nos)

Underpass For New Pantai Expressway with LDP Above. (2500 Nos)

 Deepest Excavation Depth: 9.5m 

Main Contractors: Many (ROAD BUILDER, UEM, IJM, PATI etc)

Underpass For New Pantai Expressway with LDP Above. (2500 Nos)

SMART Tunnel at Jalan Sg.Besi - K.L Seremban Highway (Old Airport Road) (3500 nos)

Underpass For New Pantai Expressway with LDP Above. (2500 Nos)

 Excavation Depth: 10 - 11m

Main Contractor: ROAD BUILDER  

SMART Tunnel at Jalan Sg.Besi - K.L Seremban Highway (Old Airport Road) (3500 nos)

SMART Tunnel at Jalan Sg.Besi - K.L Seremban Highway (Old Airport Road) (3500 nos)

SMART Tunnel at Jalan Sg.Besi - K.L Seremban Highway (Old Airport Road) (3500 nos)

 Wall Height: 10 - 12m 

Main Contractor: GAMUDA

Putra Jaya Package LRT - BLVD 103 (1100 nos)

SMART Tunnel at Jalan Sg.Besi - K.L Seremban Highway (Old Airport Road) (3500 nos)

SMART Tunnel at Jalan Sg.Besi - K.L Seremban Highway (Old Airport Road) (3500 nos)

  Excavation Depth: 15 - 17m 

Main Contractor: PATI

Sewerage Treatment Plant - Bandar Tun Razak. (750 Nos)

For New Pantai Expressway - Tujuan Interchange, Subang Jaya (750 nos)

For New Pantai Expressway - Tujuan Interchange, Subang Jaya (750 nos)

 Excavation Depth: 7m

Main Contractor: ROAD BUILDER

For New Pantai Expressway - Tujuan Interchange, Subang Jaya (750 nos)

For New Pantai Expressway - Tujuan Interchange, Subang Jaya (750 nos)

For New Pantai Expressway - Tujuan Interchange, Subang Jaya (750 nos)

  

Main Contractor: ROAD BUILDER

Construction Of SMART Tunnel At Jalan Tun Razak- Pandan Roundabout K.L

For New Pantai Expressway - Tujuan Interchange, Subang Jaya (750 nos)

Construction Of SMART Tunnel At Jalan Tun Razak- Pandan Roundabout K.L